Automated well design workflow

On a new project the hard part is the input data, not the calculation: you do not know yet what the trajectory will be, which friction factors to use, which mud, which bit. In aide.lite a well design is put together in eleven steps, and each step builds on what the earlier ones produced. At every step the app proposes a draft solution from the data known at that point. The engineer reviews it, corrects it where needed and accepts it with Apply. After every change, torque and drag, hydraulics, surge and swab, hole cleaning, ROP and the cost recalculate on their own.

1Project

Three groups of data:

  • the region, the pressure-window source and the temperature gradient, for the mud selection and the cementing; the region also sets the regional price adjustments;
  • a price book: rig, directional drilling, bits, muds, casing, cement;
  • operation times: connections, tripping speeds, non-drilling operations, NPT.

Prices and times come filled in with default values. The well’s time and cost are built from them.

PROJECT-LEVEL DATAProjectGeneralBase costsOps bookProject nameTest wellPhasePlanGround elevationm0RegionNorth AmericaEnvironmental classRegional default (explicit)Temperature gradient°C/100mDefaultSurface temperature°C15Pressure-window sourceCalculatedDescriptionNotes about this project…Cementing · open-hole excess (0–100 %)engine defaults

2Geomechanics & lithology

Load the mud window over depth (pore pressure and fracture gradient) and the lithology map: rocks, flags and complications by layer. Both tables are by true vertical depth subsea (TVDSS). This data is critical for choosing the casing shoe depths, screening the drilling fluid, and selecting the bit and the cementing class.

WELL GEOLOGYGeomech & LithologyImport skillPressure profile10 pointsPaste rowsImportCSVJSONTVDSSmPorekg/m³Fracturekg/m³011101220250111014105001120155072511201660100013301750125014901910150015801990175018002030200019502090225020702140Lithology map10 layersPaste rowsImportCSVJSONTVDSSmRockFlags & complications0ClayUnc250Sandstone (weak, friable)Unc|Gvl500Sandstone (medium, default)Ibd725SiltstoneIbd1000ShaleRCl1250Sandstone (medium, default)Ibd|O11500MarlRCl|Ibd1750LimestoneMfS|O22000ShaleISh|MfS2250DolomiteO312001400160018002000020040060080010001200140016001800200022002400Pressure gradient, kg/m³TVD, mLithologyFlags & complicationsSandstone (wea…:Unconsolidated,GravelSandstone (med…:InterbeddedSiltstone: InterbeddedShale: Reactive claySandstone (med…:Interbedded, PartiallossesMarl: Reactive clay,InterbeddedLimestone: Microfract.shale, Total lossesShale: Inert shale,Microfract. shaleDolomite: Highpressure

3Rig

A rig from the catalog of land rigs, or one entered by hand, sets the limits — hookload, torque, pump pressure and flow rate, tripping speed — and the day rate.

RIG WORKFLOWRigRigrig catalog 5.1 · 10 rigsCatalog rigRIG_450K_SINGLE — 450-klbf automated single rigDay rate$/day19000fromprice book450-klbf automated single rig; 1,150 hp drawworks; 2 × 1,600 hp pumps; 7,500-psi-rated circulation circuit.NA (CANADA)MENABlock weightt11.8fromcatalogLoad capacityt204.1fromcatalogMax torqueN·m31180fromcatalogMax pressurebar364.4fromcatalogMax block heightm16.5fromcatalogMax flow ratem³/s0.054fromcatalogComponents: stock setStockCatalogMud systemfrom catalog · SURF_7K5Pipe handlingRange 3 · singles · 0 / 0 / 0 stands

4Targets & trajectory

Every other calculation needs the trajectory. A known trajectory can be loaded; a new one can be designed automatically from the drilling targets and the constraints you set: kick-off point, angles, DLS. The result comes with a check of every constraint.

TRAJECTORY WORKFLOWTargetsDraft trajectoryCancelAccept as activeQC: passKick-off pointm500Transport DLS max°/30m6Production DLS max°/30m4TargetsLanding · 1 productionImportEXPORTCSVJSONTargetNSmEWmTVDmIncdegAzdegT1LANDING110001100900T2150001100——Add production targetChartsTableActual trajDesigned trajDesign QCCost reportCasing T&DResultsErrorsPlan view02004006008001 0001 2001 400-1 000-50005001 000EW, mNS, m1234567891011T1T2Vertical view02004006008001 00002004006008001 0001 2001 4001 600Departure, mTVD, m1234567891011T1T2TD2226mMDTVD at TD1100mDeparture1499.9mMax DLS6°/30m

5Casing scheme

The casing scheme is built on a graph of standard hole–casing combinations. You usually start from the size the production requirements set, and the graph lights up the sizes allowed above and below it; the lower strings can be made liners. This gives a quick prototype of the well design.

WELL CONSTRUCTIONCasing SchemeResetApplyCasingLinerHole sizeCasingLinerHole sizeCasingHole sizeCasingHole size3 1/244 1/255 1/26 5/877 5/88 5/89 5/89 3/44 1/24 3/45 7/866 1/86 1/27 7/88 1/28 3/49 1/210 5/8121/45 1/26 5/877 5/88 5/89 5/89 7/810 3/411 3/411 7/813 3/8146 1/27 7/88 1/28 3/49 1/210 5/812 1/414 1/214 3/416171/27 5/88 5/89 5/89 7/810 3/411 3/411 7/813 3/8141618 5/8208 1/28 3/49 1/210 5/812 1/414 1/214 3/41617 1/22024269 5/89 7/810 3/411 3/411 7/813 3/8141618 5/820243010 5/812 1/214 1/214 3/41617 1/22024263036

6Section intervals

Next come the section depths. For a clear picture, the interval chart is drawn over the mud window and the lithology along the hole. This step is probably the most critical: the mud, bit and cementing programs, the drilling complications and the well’s cost all depend on it. For each section the app works out the dominant rock, the geological flags and the possible complications, and checks that the mud weight sits inside the interval’s mud window.

WELL CONSTRUCTIONSection IntervalsResetRedoApplySectionStart depthmMDShoe depthmMDMud weightkg/m³Pore / Frackg/m³1613255611961120/132012 1/455699413141195/15778 1/2994147114531324/1692Shale: UCS 200 bar; BH 100000000 Pa; Abrasiveness 2Section roleProductionH₂SYN?ReservoirYNLow-permYN?GravelYNInterbeddedYNInert shaleYN?Reactive clayYN?AnhydriteYN?Microfract. shaleYN?CO₂ / acid gasYN?Salt (halite)YN?K–Mg saltsYN?KaoliniteYN?PermafrostYN?UnconsolidatedYN?Partial lossesTotal lossesHigh pressureDepleted zonesSloughingSalt creepKick riskHigh temp61471222614741394/17481200140016001800020040060080010001200140016001800200022002400Pressure gradient, kg/m³MD, mS1 · 1196S2 · 1314S3 · 1453S4 · 1474LithologyFlags & complicationsSandstone (wea…:Unconsolidated,GravelSandstone (med…:InterbeddedSiltstone: InterbeddedShale: Reactive claySandstone (med…:Interbedded, Partiallosses

7Bit & ROP

This step runs mostly on its own: from the rock, the hole size and the pressures in the section, the app selects a PDC bit design, the weight on bit and the HSI, and estimates the torque on bit and the rate of penetration. They are needed later to optimize the drilling program and the well’s cost.

DRILL OPSBit SelectorResetApplySection 1406.4mm· TVD344mBit aggressivenessNon-aggressiveMediumAggressiveSandstone (medium, default)·Gravel, Interbedded· MW1196kg/m³· pore1114kg/m³DESIGNPDCBLADES6CUTTERS80CUTTER Ø13mmBACK RAKE27.5°REC. WOB29tTORQUE12548.4N·mROP37.5m/hBIT HSI1.27hp/in²BIT PRICE24.19$/mNOTESinterbedding not modeled · abrasivesection: back rake +5 deg · rop/torquecomputed by the calc_rop model at the…Cuttings · size5.4mm· density2450kg/m³· bed porosity0.41Section 2311.1mm· TVD690mBit aggressivenessNon-aggressiveMediumAggressiveShale·Interbedded· MW1314kg/m³· pore1120kg/m³DESIGNPDCBLADES6CUTTERS61CUTTER Ø13mmBACK RAKE22.5°REC. WOB22.2tTORQUE8891.8N·mROP98.7m/hBIT HSI3.45hp/in²BIT PRICE11.7$/mNOTESimpermeable rock: class from upper CCSestimate · shale: strength-basedclassification unreliable · interbedding no…Cuttings · size7.5mm· density2500kg/m³· bed porosity0.39Section 3215.9mm· TVD908mBit aggressivenessNon-aggressiveMediumAggressiveShale· MW1453kg/m³· pore1260kg/m³DESIGNPDCBLADES6CUTTERS42CUTTER Ø13mmBACK RAKE22.5°REC. WOB15.4tTORQUE4242.9N·mROP78.5m/hBIT HSI2.75hp/in²BIT PRICE15.59$/mNOTESimpermeable rock: class from upper CCSestimate · shale: strength-basedclassification unreliable · rop/torque…Cuttings · size7.5mm· density2500kg/m³· bed porosity0.39Section 4152.4mm· TVD1046mBit aggressivenessNon-aggressiveMediumAggressiveSandstone (medium, default)·Interbedded· MW1474kg/m³· pore1360kg/m³DESIGNPDCBLADES6CUTTERS30CUTTER Ø13mmBACK RAKE27.5°REC. WOB10.9tTORQUE1764.7N·mROP35.8m/hBIT HSI1.5hp/in²BIT PRICE40.32$/mNOTESinterbedding not modeled · abrasivesection: back rake +5 deg · rop/torquecomputed by the calc_rop model at the…Cuttings · size5.2mm· density2450kg/m³· bed porosity0.41Mud line / wellhead — 0 m02004006008001000120014001600180020002200MD, m406.4 mm311.1 mm215.9 mm152.4 mm

8Drilling fluid

The mud selector checks how well each of twelve fluid systems suits the section — by the mud window, the rocks and complications, the region and the price — and proposes up to three candidates per section. For each it selects the mud weight and the rheology for hole cleaning, and estimates the price per cubic metre.

DRILL OPSMud SelectorResetApplyRegionNAEco classdefaultTemp gradientregional defaultWindow sourcecalcedited on the Project pageSECTIONS4of4scoredSection 116Formate75450 $/m³Section 212 1/4HPWBM (KCl + glycol / amines)82359 $/m³Section 38 1/2Shale· UCS200 bar·impermeable·window1327–1693 kg/m³· ρ plan1453 kg/m³· traj profileCconfidence:mediumroleProduction· payno· H₂Sno· flags10/10(yes:Reactive clay)· complications0edited on the Formation leaf and the Section pageCANDIDATESInvert-emulsion OBMbase fluid: diesel86654 $/m³HPWBM (KCl + glycol / amines)86382 $/m³☑reuseSilicate75278 $/m³CRITERIAInhibition5Temperature margin5Density margin3.7Trajectory / lubricity5Filter cake / diff. sticking5Rheology / Hole cleaning5Lost circulation3Reservoir4.5Environmental1Cost score1.5Regional experience5Window / ECD3Requirements2Hold points1Warnings3Conflicts0Excluded5Cost654 $/m³τy, Pa2.89K, Pa·sᵐ0.211m0.72Section 46Invert-emulsion OBM83655 $/m³

9Drilling program

Now, for each section, the app selects:

  • the drill string;
  • the RPM and the flow rate, within the rig’s limits;
  • the directional drilling tier;
  • the friction factors, from statistical data.

From here on, torque and drag, hydraulics, surge and swab and hole cleaning are calculated for every section.

DRILL OPSDrillingResetApplySurvey11stationsTD2226 mRig RPM limit176 rpmRig flow limit0.054 m³/sedited on the Trajectory and Rig pagesSECTIONS4of4proposedSection 116″VerticalT13blocksFF0.340Section 212 1/4″HorizontalT13blocksFF0.275Section 38 1/2″MD994.00 m–1471.00 m· Hole8 1/2″· Mud1453 kg/m³·Not reservoir· Mud systemC5· Reactive clayyesWeight on bitt15.4ScenarioAverageConservativeTIERT1FLOW RATE0.024 m³/sSURFACE RPM80OVERWEIGHT10.0 tTRIP IN SPEED1.05 m/sTRIP OUT SPEED1.70 m/sFRICTION FACTORSSLACK-OFF0.275PICK-UP0.275ROTATE0.202TRANSLA…0.041DRILL STRINGTypeComponentLength,mDrillpipe5 in, G-105, NC50, 29.36 lb/ft1392.01↑↓✕Heavy-weight DP5 in, J-55, NC50, 51.64 lb/ft30↑↓✕BHA6 3/4 in, 115 ksi, NC50, 100.5 lb/ft50↑↓✕Open endSection 46″HorizontalT23blocksFF0.2751limit

10Casing running program

The casing strings and the running parameters are refined. The friction factors, as in the drilling program, come from statistical data; torque and drag and surge and swab while running the casing are calculated with them.

CASING & CEMENTINGCasing RunsResetApplySurvey11stationsTD2226 mTrip in1.05 m/sTrip out1.70 m/sRegionNAedited on the Trajectory, Rig and Project pagesSECTIONS4of4designedSection 116″Casing13 3/8″J-55$123,660FF0.484Section 212 1/4″Casing9 5/8″J-55$130,469FF0.446Section 38 1/2″MD994.00 m–1471.00 m· Hole8 1/2″· Casing7″· GradeL-80· H₂SnoScenarioAverageConservativeRotationLinerSURFACE RPM0OVERWEIGHT10.0 tTRIP IN SPEED1.05 m/sTRIP OUT SPEED1.70 m/sFRICTION FACTORSSLACK-OFF0.320PICK-UP0.320ROTATE0.230TRANSLA…0.051CASING STRINGTypeComponentLength,mPriceCasing7 in, L-80, 34.61 lb/ft, 6.004 in ID1471.01138.3↑↓✕String$203,436Open endSection 46″Liner4 1/2″L-80$45,035FF0.295

11Cementing

For each section the app proposes a cementing scheme and a price class for every interval, depending on the geology and the conditions in the section. The rig time, waiting on cement included, is estimated separately. This gives the cost and the time of the cementing.

CASING & CEMENTINGCementingAutoApplySection 1S1·16Top0.00 m7.9 hrSection 2S2·12 1/4Top0.00 m13.8 hrSection 3S3·8 1/2Shoe1471.00 m·StringCasing·Roleproduction·Window1327/1693 kg/m³CementedYNTwo-stageYN?FoamYN?WOCYNBatchYN?LogYN?TierStartStopPriceC1 · Standard tail1471994420✕Overlap formation (shale) flags: Reactive clayC0 · Standard lead9940250✕Overlap casingComments2Warnings2OPERATIONRig-up2.5Conditioning2.0Pumping1.7Technology0.0Rig-down0.5Job6.7WAITING ON CEMENTSet time16.0WOC gate0.0Log gate0.0Absorbed by the next operation0.0On the critical path0.0Evaluation log0.0RIG TIME6.7Cementing contractor on site4.7Section 4S4·6Top1471.00 m14.8 hr020040060080010001200140016001800200022002400MD, mLithologyFlags & complicationsSandstone (wea…:Unconsolidated,GravelSandstone (med…:InterbeddedSiltstone: InterbeddedShale: Reactive claySandstone (med…:Interbedded, PartiallossesC0STDC1C2C3

Result

From a minimum of input data you get a draft well design: the trajectory, the casing scheme, bits, muds, drill strings, casing strings, cement, the calculations for every run, the time and the cost, and a report in HTML or PDF. The draft is then refined section by section, in each section’s drilling and casing runs, and the calculations follow every edit.

Time–depth · well05001 0001 5002 000024681012DaysMD, mSection 1Section 2Section 3Section 4Drilling runCasing runCementing (rig)Wellhead & BOPRig hours by phase308.1 hRIG HOURSDrilling run123.5 h40 %Logging0.0 h0 %Casing run53.4 h17 %Cementing (rig)37.0 h12 %Wellhead & BOP50.0 h16 %NPT44.2 h14 %Cost by program$1,280,564WELL COSTDrilling$156,15112 %Bit$56,4454 %Casing$544,85643 %Cementing$221,25117 %Mud$227,29018 %Other$74,5716 %

The first 80% of a well design — in minutes, not weeks.